VisionToSOP

SOP Templates

Start from a proven template. Customize with your shop-specific details, then generate your SOP in seconds.

HVAC

Furnace Filter Replacement

Safe replacement of residential furnace filters including size identification, proper disposal, and system verification.

~7 steps
HVAC

Seasonal AC Startup Checklist

Complete spring startup procedure for residential central air conditioning including electrical checks, refrigerant verification, and test run protocol.

~10 steps
HVAC

Refrigerant Handling Procedure

EPA-compliant refrigerant recovery, recycling, and recharge procedure including safety requirements and documentation.

~9 steps
HVAC

Thermostat Installation and Programming

Step-by-step installation of programmable and smart thermostats including wiring, configuration, and customer handoff.

~8 steps
HVAC

Blower Motor Replacement

Safe replacement of furnace blower motors including electrical disconnect, motor removal, installation, and test run.

~10 steps
Plumbing

Water Heater Replacement

Complete gas or electric water heater replacement including shutoff, drain, disconnect, installation, and startup procedures.

~12 steps
Plumbing

Drain Cleaning Procedure

Residential drain cleaning using manual snake and hydro-jet methods including safety, setup, and cleanup procedures.

~8 steps
Plumbing

Fixture Installation — Faucet and Sink

Standard faucet and undermount sink installation including shutoff, removal, installation, and leak testing.

~9 steps
Plumbing

Rough-In Plumbing Sequence

New construction rough-in sequence for supply and drain lines including layout, materials, and inspection preparation.

~11 steps
Electrical

Panel Change-Out Procedure

Complete residential electrical panel replacement including utility coordination, removal, installation, and inspection preparation.

~12 steps
Electrical

GFCI Outlet Installation

Safe installation of GFCI outlets in wet locations including circuit identification, wiring, testing, and code compliance verification.

~7 steps
Electrical

Outlet and Switch Replacement

Standard outlet and switch replacement including circuit shutoff, removal, installation, and testing.

~6 steps
Electrical

Service Upgrade — 100A to 200A

Residential electrical service upgrade procedure including utility coordination, meter base, panel, and grounding system.

~14 steps
Auto Repair

Oil Change and Filter Replacement

Standard oil and filter change including drain, filter removal, refill, and quality check procedures.

~8 steps
Auto Repair

Brake Pad and Rotor Replacement

Complete front or rear brake service including caliper removal, rotor inspection, pad installation, and brake bedding procedure.

~11 steps
Auto Repair

Diagnostic Workflow — Check Engine Light

Systematic diagnostic procedure for check engine light including scan, code research, component testing, and repair verification.

~9 steps
IT/Help Desk

New Employee Workstation Setup

Complete new hire workstation configuration including hardware setup, software installation, account creation, and security configuration.

~10 steps
IT/Help Desk

Network Troubleshooting — No Connectivity

Systematic network connectivity troubleshooting from physical layer through DNS including escalation criteria.

~8 steps
Security

New Post Orientation Procedure

Site-specific new officer orientation including post order review, equipment check, patrol route walkthrough, and emergency procedure briefing.

~9 steps
Security

Incident Documentation Procedure

Proper incident documentation including report writing, evidence preservation, witness statements, and escalation procedures.

~8 steps